IB-11A-210 — Self-Powered Relay Three-Phase Trip With Magnetic Latch Actuator

Download Asset

The equipment covered by this publication must be selected for the inside of the door of the pad-mounted switchgear, and.

⸻ CONNECT ⸻

Let's Talk About Your Application

Not sure where to start? Our engineering and sales teams can help identify the right solution for your facility, application, and operating environment.